Date:20 January 2022

Quarter:3

CDS Hosts CQI

Chair: Bryn Rhodes

Scribe: Bryn Rhodes

Minutes Approved as Presented 


This is to approve minutes via general consent. "You have received the minutes. Are there any corrections to the minutes? (pause) Hearing none, if there are no objections, the minutes are approved as printed."

Goals

CQL Project Update

CQL Errata and STU Comments

  • FHIR-34804 - Improve backwards compatibility support for terminology types Triaged

CDS/CQI FHIR Trackers

  • FHIR-34882 - Add a Data Repository role to the data element submission diagram Triaged

R5 Ballot Update

Infrastructure IG PSS

https://jira.hl7.org/browse/PSS-1937 Infrastructure IG

Discussion items

TimeItemWhoNotes


CQL Project Update



Minutes

CQL Project Update:

  • Current open items:

    T Key Summary Assignee Reporter P Status Resolution Created Updated Due
    Loading...
    Refresh

  • Added a vNext tag and an Errata tag to all items
  • Plan is for an Errata/STU Update near term, followed by a more extensive ballot in the Sept 2022/Jan2023 timeframe
  • Errata specifically covering 1.4/1.5 backwards compatibility issues:
  • CQF-Tooling Library refresh should be able to ensure that the options are preserved
    • Current approach is to in the ecqm-content repositories, use the same options as specified in the MAT (which are recommended/prescribed in the QM IG)
  • Is the 1.4 compatibility mode only for the translator or the does the engine need it too?
    • Only the translator, the engine (Java at least) runs all versions because of the way the ELM changes were made, older ELM will load and run in newer engines (but not vice versa)
  • Log an issue on tooling to allow for checking of CQL Options if the ones present in existing ELM don't match the ones in the environment Bryn Rhodes 

CDS/CQI FHIR Trackers

  • FHIR-34882 - Add a Data Repository role to the data element submission diagram Triaged
  • Do submitting systems need to handle ID translation
    • That's a DEQM concern, but generally yes, different approaches might include isolation and multi-tenancy
    • Tracker approved, accept PR and mark applied

R5 Ballot Update

  • IG Balloting Criteria
    • Will you have bandwidth for building and reconciling the IG (in addition to R5)
    • Will the community have bandwidth to review the IG (in addition to R5)
    • Will need to defend the decision to ballot given prioritization of R5 for the May cycle
  • HL7 FHIR-specific dates
    • March 4 - FHIR Core Substantive Freeze
    • March 15 - Content Freeze
    • March 29 - Ballot readiness signoff
  • Proposed resource maturities:
    • Resource

      WG

      STU3

      R4

      R4B

      R5

      ActivityDefinition

      CDS

      2

      2

      3

      4

      Citation

      CDS



      0


      DetectedIssue

      CDS

      1

      1

      1

      3

      EventDefinition

      CDS


      0

      0

      -

      Evidence

      CDS


      0

      1

      2

      EvidenceReport

      CDS



      0

      1

      EvidenceVariable

      CDS


      0

      1

      2

      GuidanceResponse

      CDS

      2

      2

      2

      4

      Library

      CDS

      2

      2

      3

      5

      Measure

      CQI

      2

      2

      3

      5

      MeasureReport

      CQI

      2

      2

      3

      5

      PlanDefinition

      CDS

      2

      2

      3

      4

      RequestGroup

      CDS

      2

      2

      2

      4

      RiskAssessment

      CDS

      1

      1

      1

      3

    • GuidanceResponse: FHIR-35849 - Getting issue details... STATUS


Infrastructure IG Project Proposal:

Reviewed but would like more review from CDS/CQI members before commenting

Adjourned at 2:43 CT

Action items