Enter the name of the project here: Version 2 Quality Criteria

Jira
showSummaryfalse
serverJIRA
serverId9b965702-34a7-3433-bf10-7f66fd69238c
keyPSS-1375

Project ID: An ID will be assigned by Project Insight

Complete this section for all “Direct to Normative” ballot projects and when a project proceeds from “Informative to Normative” or “STU to Normative”.

Forward PSS to the TSC (via tscpm@HL7.org); this triggers American National Standards Institute (ANSI) Project Initiation Notification (PINS) submission.

 

TSC Notification:  Informative/STU to Normative 

Date:  Submission date

 X

- or -                     Direct to Normative (no STU) (includes reaffirmations)       

 

Identify ISO, IEC or ISO/IEC standard to be adopted in text box below

Enter info here if an ISO, IEC, or ISO/IEC Standard is to be adopted as an American National Standard; Enter the designation of the standard(s) to be adopted:

Includes text from ISO, IEC or ISO/IEC standard: Check here if this standard includes excerpted text from one or more ISO, IEC or ISO/IEC standards, but is not an identical or modified adoption.

Yes

 

No

Select the unit of measure used in the standard; if no measurements are in the standard, select N/A

 

N/A

 

U.S.

Metric

 

Both

 

Investigative Project (aka PSS-Lite)

Date : 

Check this box when the project is investigative or exploratory in nature, which allows limited project scope definition. Sections 1-Project Name, 2-Sponsoring Group(s)/Project Team, 3a-Project Scope, 3b-Project Need, 3e-Project Objectives/Deliverables/Target Dates, 3i-Project Document Repository, 6b-[Realm, if known], and 6d-[applicable Approval Dates] are required for Investigative Project. Investigative Project specific instructions are highlighted in yellow. An investigative project must advance in two WGM cycles, requiring a full scope statement. Otherwise the project will be closed.

...