|
|
|
Assigned by the HL7 PMO via Project Insight
|
|
|
|
(Includes Reaffirmations)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Work Groups formed in 2019 or later are located at the bottom of the dropdown.
|
|
Start typing to get list of options (supports multiple selection)
|
|
|
|
(Monthly, at WGMs, etc)
|
|
Start typing to get list of options (supports multiple selection)
|
|
|
|
(Monthly, at WGMs, etc)
|
|
Start typing to get list of options (supports multiple selection)
|
|
|
|
(Monthly, at WGMs, etc)
|
|
Start typing to get list of options (supports multiple selection)
|
|
|
|
(Monthly, at WGMs, etc)
|
|
Start typing to get list of options (supports multiple selection)
|
|
|
|
(Monthly, at WGMs, etc)
|
|
Start typing to get list of options (supports multiple selection)
|
|
|
|
(Monthly, at WGMs, etc)
|
|
Start typing to get list of options (supports multiple selection)
|
|
|
|
(Monthly, at WGMs, etc)
|
|
Start typing to get list of options (supports multiple selection)
|
|
|
|
(Monthly, at WGMs, etc)
|
|
Start typing to get list of options (supports multiple selection)
|
|
|
|
(Monthly, at WGMs, etc)
|
|
Start typing to get list of options (supports multiple selection)
|
|
|
|
(Monthly, at WGMs, etc)
|
|
|
|
|
|
|
|
(Required if balloting in the same cycle as PSS submission)
|
|
|
|
|
|
|
|
(Required for Implementation Guide projects)
|
|
(e.g. SOA, etc)
|
|
(Two Required for STU Projects)
|
|
|
|
|
|
|
|
|
|
|
|
Append date to each listed. Target Dates can be in WGM/Ballot Cycle format; ex: January 2020 Ballot or May 2020 WGM
|
|
|
|
|
|
|
|
Required for TSC approval
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name of the standard being revised Date it was published (or request for publication, or ANSI designation date) Rationale for revision The relationship between the new standard and the current standard (is it designed to replace the current standard, a supplement to the current standard, etc.)
|
|
|
|
If necessary, add any additional ballot information here
|
|
Joint Copyrighted Material will be produced?
|
|
|
|
Include SDOs or other external entities you are collaborating with, including government agencies as well as any industry outreach. Indicate the nature and status of the Memorandum of Understanding (MOU) if applicable
|
|
How much content for this project is already developed? Indicate %
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|