- Created by Yan Heras, last modified on May 03, 2022
Short Description | Test the Da Vinci Risk Adjustment Implementation Guide |
Long Description | Continue the testing of the Da Vinci Risk Adjustment Implementation Guide.
|
Type | Test an implementation guide |
Submitting Work Group/Project/Accelerator/Affiliate/Implementer Group | Clinical Quality Information (CQI)/DaVinci Project |
Track Lead(s) | Yan Heras |
Track Lead Email(s) | yan.heras@optimumehealth.com |
Related Tracks | N/A |
FHIR Version | FHIR R4 |
Specification(s) this track uses | STU1: https://build.fhir.org/ig/HL7/davinci-ra/ Draft STU2 Branch: http://build.fhir.org/ig/HL7/davinci-ra/branches/Draft-STU2-Branch/index.html |
Artifacts of focus | FHIR Resources:
Operation: $report Profiles:
|
Expected participants | Novillus Optum Alphora Epic |
Zulip stream | https://chat.fhir.org/#narrow/stream/311469-Da-Vinci.20Risk.20Adjustment/topic/Connectathon |
Track Kick Off Call | April 28, 12pm - 1pm ET during the regular Risk Adjustment weekly meeting (call information is available at: Risk Adjustment) Track kickoff presentation slides Track kickoff recording |
Track Details | System roles:
Scenarios Get Scenario to test the Parameters
GET Scenario to test the Results
Reference Implementation End Point: https://cloud.alphora.com/sandbox/r4/ra/fhir/ (NEW end point) There will be two separate instances of Risk Adjustment validator set up in Touchstone. One points to the STU1 IG and another points to the Draft STU 2 branch of the IG. Test Scripts: https://touchstone.aegis.net/touchstone/testdefinitions
Document Testing Results: all testing results will be documented in the Connectathon Manager: http://conman.clinfhir.com/connectathon.html?event=con30 STU1 Test Plan: https://confluence.hl7.org/display/DVP/%24report+Test+Plan+Template Miro Board: https://miro.com/app/board/uXjVO4TXito=/?share_link_id=406483413721 |